INDIANTOWN GAP NATIONAL CEMETERY

ANNVILLE, PENNSYLVANIA

General Construction Aerial Construction of Honor Guard Building Aerial (fall foliage)
  • Indiantown Gap National Cemetery – Phase 4
  • Department of Veterans Affairs – Office of Construction and Facilities Management
  • Contract Number: VA101CFM-C-0165
  • Construction Timeframe: 2011 – OPEN
  • Construction Cost: $18,511,463

A 30 acre expansion that includes general construction, general alterations, general demolition, clearing and grubbing, erosion controls, roads, paving, walks, site preparation, grading, drainage and storm sewer work, earthwork, landscaping, irrigation, site furnishings, fencing, signage, demolition and certain other items. This project includes 7,300 double depth crypts, a 5,500 columbarium niche complex, 110 memorial wall markers, construction of two new committal shelters and a new honor guard building, as well as renovations to the existing Administration Building.

X

WASHINGTON CROSSING NATIONAL CEMETERY

NEWTOWN, PENNSYLVANIA

General Construction Aerial Columbarium Construction Columbarium Construction Crypt Lid Safey Placement Administration Building Complete Columbarium
  • Washington Crossing National Cemetery – Phase 1B Development
  • Department of Veterans Affairs – Office of Construction and Facilities Management
  • Contract Number: VA-101CFM-C-0082
  • Construction Timeframe: 2010 – 2012
  • Construction Cost: $21,333,418

General construction, excavation, including the supply and installation of 10,031 double concrete crypts, 3,600 cremation plots, 4,140 columbarium niche complex, access roads, an entrance area, public information center, administration and maintenance complexes, flag & assembly area, memorial walkway/ wall area and donations area, two new committal service shelters, new roadway system and parking lots, site furnishing, landscaping and irrigation.

X

CALVERTON NATIONAL CEMETERY

CALVERTON, NEW YORK

General Construction Aerial Crypt Placement Aerial Crypt Installation
  • Calverton National Cemetery Gravesite Expansion Project
  • Department of Veterans Affairs - Office of Construction and Facilities Management
  • Contract Number: VA101CFM-C-0054
  • Construction Timeframe: 2009 - 2012
  • Construction Cost: $33,914,414

The entire scope of this expansion project included site development of approximately 90 acres for cemetery expansion, as well as improvements of existing features and facilities. Work included the construction of over 8,000 linear feet of roadway, repair and paving of existing roadways, the supply of 28,000 concrete crypts, installation of 33,000 concrete crypts, including triple and oversized units, construction of a complete columbarium complex containing 4,836 columbarium niches, renovations to the existing administration and maintenance facilities, renovations to seven committal shelters, a new guard booth, new signage, vase stations, benches, watering stations, as well as irrigation and landscaping throughout the entire expansion area.

X

GERALD B.H. SARATOGA NATIONAL CEMETERY

SARATOGA, NEW YORK

Construction of Committal Shelter Irrigation Source Systems Construction Irrigation Source Systems Construction Landscaping & Irrigation
  • Gerald B.H. Soloman Saratoga National Cemetery - Phase II
  • Department of Veterans Affairs – Office of Construction and Facilities Management
  • Contract Number: VA-786-C-0047
  • Construction Timeframe: 2007 – 2008
  • Construction Cost: $7.5 Million

This project included general construction, alterations, over 2,500 ft of new roadway, two new committal shelters, walks, 4,584 columbaria niche complex, 5,700 pre-placed crypts, grading, drainage, mechanical and electrical work, utility systems, miscellaneous specialties, landscaping, irrigation and irrigation source systems. G&C designed & installed a coffer dam with new bracketing system and used a vacuum system to remove ten feet of existing silt from intake structure. While using extreme safety measures, we cleaned the intake housing and installed the trash rack and installed a new Sefar fabric mounted to the top of the intake structure. All intake work was completed by G&C Fab-Con.

X

BATH NATIONAL CEMETERY

BATH, NEW YORK

Columbarium Construction Double Depth Crypt
  • Expansion and Columbarium Work at Bath National Cemetery
  • Department of Veterans Affairs – Office of Construction and Facilities Management
  • Contract Number: VA786A-C-0412
  • Construction Timeframe: 2011 – 2012
  • Construction Cost: $2,774,649

General construction, roads, walks, drainage, supply and installation of 1,603 pre-placed double crypts for early turnover Section V, and the construction of 1,120 columbarium niche complex.

X

BLACK HILLS NATIONAL CEMETERY

STURGIS, SOUTH DAKOTA

Replacement Irrigation System
  • Black Hills National Cemetery - 2,400 Columbarium Niches
  • Department of Veterans Affairs – National Cemetery Administration
  • Contract Number: VA-786A-C-0128
  • Construction Timeframe: 2009 - 2010
  • Construction Cost: $1,400,485

Construction of 2,400 pre-cast concrete columbarium niches, colored flatwork concrete, stone veneer on units, erection of precast architectural caps, cast medallion wall section markers, removal of existing irrigation system, installation of new irrigation system, six vase & hydrant stations, and landscaping of all disturbed areas including planting 70 new pine trees native to the area.

X

DAYTON NATIONAL CEMETERY

DAYTON, OHIO

Building Construction Building Construction
  • Dayton National Cemetery
  • Department of Veterans Affairs – National Cemetery Administration
  • Contract Number: VA 786A-C-0098
  • Construction Timeframe: 2008
  • Construction Cost: $854,000

This was a design build project that included an upper parking area 150' x 150' with 175' of paved roadway and an 85' x 24' employee parking area. A historic guard house renovation including complete re-pointing of the existing masonry veneer, newly designed handicap ramp with railing, new heating & air conditioning system, new electrical service, new plaster applied to the entire interior, door repairs, new windows with hardware, new pine flooring, paint and related work. Finally, we constructed a new 3-bay service and wash-bay structure with three 12' x 24' storage bin units.

X

 

Safe Placement & Installation of Double Depth Crypts

Safe Placement & Installation of Double Depth Crypts

(project standard)

Number Stencil of Placed Crypts

Number Stencil of Placed Crypts

(project standard)

Crypt Placement & Safety Testing

Crypt Placement & Safety Testing

(project standard)

Construction Safety Measures

Construction Safety Measures

(project standard)

Roadway Construction

Roadway Construction

Crypt Installation

Crypt Installation

Columbarium Masonary Work

Columbarium Masonary Work

Roadway & Sidewalk Construction

Roadway & Sidewalk Construction

Lid Testing

Lid Testing

Unconfined Load Test

Unconfined Load Test

Confined Load Test

Confined Load Test